Golshahr- Hashtgerd Tehran metro line 5 extension

planed

Project Specifications

Extension Location: Tehran metro's line 5 (Golshahr-Hashtgerd)
Client: Farab Company
Type of System: 2×25 kV Autotransformer
Length: 2×26.5 Km
Speed: 120 Km/h
Executive Level: Design check out, Manufacturing of the fittings
Type of Agreement: EPC
Responsibility: Overhead network designing, Power network Studies and simulation, design and manufacturing of fittings and equipment, Installation and implementation of network.

 

Go back

© 2014-2022 All right reserved, Alucast Iran Co.